Consider the following statements about the New Pamban Rail Bridge:
- It features a vertical lift span designed to allow ship movement without dismantling the structure.
- The bridge uses polysiloxane paint to prevent corrosion in marine environments.
- It replaces the old Pamban Bridge, which was India’s first sea bridge with a Scherzer rolling lift mechanism.
- The new bridge’s curvature near Rameswaram limits train speeds to 80 km/h despite being capable of supporting higher speeds.
Which of the above statements are correct?
Explanation: All statements are accurate. The vertical lift span (1), anti-corrosion paint (2), replacement of the historic Scherzer bridge (3), and speed limitations due to curvature (4) are confirmed in.
Explanation: All statements are accurate. The vertical lift span (1), anti-corrosion paint (2), replacement of the historic Scherzer bridge (3), and speed limitations due to curvature (4) are confirmed in.