Which of the following statement(s) is/are correct about the 'Kaleshwaram Multi-purpose Irrigation Project'?
-
- It will harness water at the confluence of two rivers Pranhita with Godavari.
- It will reverse pump the water into the main Godavari River and divert it through lifts and pumps into a huge and complex system of reservoirs, water tunnels, pipelines and canals.
- The total length of the Kaleshwaram Project is approximately 1,832 kilometres.
Select the correct codes from below:
Explanation - The Kaleshwaram Lift Irrigation System is considered to be one of the world's largest multi-purpose projects. It is designed to provide water for irrigation and drinking purposes to about 45 lakh acres in 20 of the 31 districts in Telangana, apart from Hyderabad and Secunderabad. The cost of the project is Rs 80,000 crore, but is expected to rise to Rs 1 lakh crore by the time it is completely constructed by the end of 2020. This project is unique because Telangana will harness water at the confluence of two rivers Pranhita with Godavari by constructing a barrage at Medigadda in Jayashankar Bhupalpally district and reverse pump the water into the main Godavari River and divert it through lifts and pumps into a huge and complex system of reservoirs, water tunnels, pipelines and canals. The project has set many records with the world's longest water tunnels, aqueducts, underground surge pools, and biggest pumps. By the time the water reaches Kondapochamma Sagar, the last reservoir in the system, about 227 kms away in Gajwel district, the Godavari water would have been lifted to a height of 618 metres from its source at Medigadda. The total length of the entire Kaleshwaram project is approximately 1,832 km of which 1,531 km is gravity canals and 203 km comprise water tunnels. There are 20 water lifts and 19 pump houses in the project.
Explanation - The Kaleshwaram Lift Irrigation System is considered to be one of the world's largest multi-purpose projects. It is designed to provide water for irrigation and drinking purposes to about 45 lakh acres in 20 of the 31 districts in Telangana, apart from Hyderabad and Secunderabad. The cost of the project is Rs 80,000 crore, but is expected to rise to Rs 1 lakh crore by the time it is completely constructed by the end of 2020. This project is unique because Telangana will harness water at the confluence of two rivers Pranhita with Godavari by constructing a barrage at Medigadda in Jayashankar Bhupalpally district and reverse pump the water into the main Godavari River and divert it through lifts and pumps into a huge and complex system of reservoirs, water tunnels, pipelines and canals. The project has set many records with the world's longest water tunnels, aqueducts, underground surge pools, and biggest pumps. By the time the water reaches Kondapochamma Sagar, the last reservoir in the system, about 227 kms away in Gajwel district, the Godavari water would have been lifted to a height of 618 metres from its source at Medigadda. The total length of the entire Kaleshwaram project is approximately 1,832 km of which 1,531 km is gravity canals and 203 km comprise water tunnels. There are 20 water lifts and 19 pump houses in the project.